BeePlanet Factory
ALTERNATIVE ENERGY INNOVATIONS Bind Industry 40 Acceleration Program Startup

Sustainable energy storage solutions made out of 2nd life EV batteries

  • Project: BeePlanet Factory & Iberdrola. The installation of storage systems based on second-life batteries for electric vehicles allows, on the one hand, to optimize the installation of recharging points by enabling locations where there is no supply point with the necessary power, on the other hand, to favor sustainability by facilitating the integration of photovoltaic solar generation at the recharging points, and finally favoring the circular economy with the best use of batteries before recycling.
  • Project: BeePlanet Factory & Mercedes Benz. Energy storage system over reused lithium batteries. Our objective is to reduce power demand over the electric distribution network. Optimization of green energy (photovoltaic) usage in industrial environments.

Articles related with BeePlanet Factory

1010/01/2020

Revealing the 38 Startups Selected for 4th and Largest Cohort

10/01/2020|

The international startups selected for the 4th edition of the Bind 4.0 Acceleration Program Bind 4.0 Opened registration worldwide in July 2019 and received 577 Applicants from 78 countries, which we evaluated and compared to the specified needs of our Partner firms in the areas of technology and innovation applied [...]

1212/11/2019

6th annual Basque Industry 4.0, meeting point event, 2000+ attendees

12/11/2019|

More than 100 Speaking Sessions and over 2,000 Attendees Expected at the 6th Annual Basque Industry 4.0, The Meeting Point Event Basque Industry 4.0, The Meeting Point is a key annual event for Industry 4.0, currently in its 6th and largest year so far with more than 2,000 attendees and [...]

Go to Top